日日躁夜夜躁狠狠躁|日韩理论手机在线观看|狼友网精品视频在线观看|亚洲精品美女在线观看播放|一本一道av中文无码观看|国产啪精品视频网给免丝袜|久久国产乱子伦精品免费台湾|日韩无码免费高清视频一区二区

Welcome to Zibo Lugong Granulating Equipment Technology Co., Ltd.!

Tel.:86 0533-6403711 中文

Environmental protection equipment of Zibo Lugong Granulating Equipment Technology Co., Ltd.

Date: 2018-09-28 15:04:31 Click:

A side ditch should be set around the project production plant to drain away the initial rainwater in time to reduce the impact on groundwater. In summary, after taking anti-seepage measures and protective measures, the enterprise strengthens the daily production management on the basis of project production will not have an impact on groundwater. The environmental risk assessment will analyze and predict the potential dangers and harmful factors existing in the project, the unexpected accidents that may occur during the project operation (generally excluding man-made damage and natural disasters), the leakage of harmful, flammable and explosive materials, the personal and environmental impact and damage degree caused by it, and propose reasonable and feasible prevention, emergency and mitigation measures. In order to make the construction project accident rate, loss and environmental impact reach an acceptable level. Evaluate the damage to people outside the plant, the deterioration of environmental quality and the impact on the system.

According to the Notice on Further Strengthening Environmental Impact Assessment Management to Prevent Environmental Risks (No. [2012]77), Notice on Effectively Strengthening Risk Prevention and Strict Environmental Impact Assessment Management (No. [2012]98), Shandong Provincial Department of Environmental Protection forwarded the Notice on Effectively Strengthening Risk Prevention and Strict Environmental Impact Assessment Management (No. Lu Huanhan [2012] No. 509), guided by the Technical Guidelines for Environmental Risk Assessment of Construction Projects (HJ/T169-2004), proposes risk mitigation measures and emergency plans through risk identification, risk analysis and consequence calculation of the project, and provides information and basis for environmental management. Achieve the purpose of reducing danger and harm.

Workshop photo

Each production and operation area of the plant is connected by the road in the plant, and the general layout of the plant is required by the production process, saving land and facilitating the input of materials and product output, so that resources can be configured. The functional division of the plant is more clear, the arrangement between the devices is more compact, and the functional division is more reasonable.

According to the environmental testing results of the project, after the project plant is so arranged, the noise and air pollutants generated by the project plant can be discharged within the factory boundary to meet the standards.

The general layout of the project has clear functional zoning, smooth technological flow, short logistics, and basically non-cross-interfering logistics. The project locates the production workshop in the middle of the factory, reducing the impact of pollutants discharged by the project on the external environment, and the general layout of the project is reasonable.

This project has little impact on groundwater. All building units can be treated with anti-seepage treatment, pipelines are sealed, regular maintenance is carried out, reinforced concrete structures are adopted in the solid waste temporary storage room and workshop floor, and epoxy resin anti-seepage layer is laid to minimize the project's possible impact on groundwater.

This EIA will divide the project area into general impermeable zone and impermeable zone to analyze groundwater environmental impact and propose groundwater prevention measures.

In the project, facilities and areas where sewage leakage may occur, such as the septic tank stacking site, are taken as anti-seepage areas, and other areas are taken as general anti-seepage areas. Project drainage has little impact on groundwater environment.

Activated carbon adsorption device exhaust cylinder

Other news

儋州市| 莒南县| 乌什县| 华容县| 秦安县| 蕲春县| 同德县| 茂名市| 定兴县| 东丽区| 大渡口区| 沅陵县| 田东县| 天峻县| 隆昌县| 乐亭县| 柳江县| 浪卡子县| 祁门县| 勃利县| 湖口县| 滕州市| 江西省| 广平县| 平南县| 象山县| 无为县| 沂源县| 通山县| 米泉市| 新乡县| 沁源县| 泰兴市| 陕西省| 容城县| 岚皋县| 绥化市| 海门市| 连城县| 丽水市| 腾冲县|